Cartoning project questions
Direct answer: Provide the flat-carton drawing and converted samples, board grade and variation, crease and glue details, opening direction, product dimensions and orientation, leaflet or insert requirements, closure method, code position and accepted finished-carton checks. The product infeed and carton erection must be assessed together because a carton can erect correctly yet fail when the product presentation is inconsistent.
Board stiffness, creases, glue, storage condition, flatness, magazine loading and suction or mechanical pick-up can all affect opening. Supply cartons from production conversion and include known difficult batches rather than hand-made samples only.
Define product orientation, spacing, grouping, flexibility and the response to a missing or damaged product. Where several items form one carton load, state how completeness is detected before insertion.
Identify the required printed information, data source, code position, carton-open and closure checks, reject decision and reject confirmation. The inspection method must match the actual defect the quality system needs to prevent.
© Copyright 2025 by Lancing Ltd - all right reserved terms & conditions